Tuesday, September 8, 2009
Boxing set up
Boxing is set up and 100m of pipe is layed in the sand under the floor.
These pipes will be used store excess solar heat under the floor during summer.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2010
(18)
►
August
(2)
►
May
(3)
►
April
(10)
►
January
(3)
▼
2009
(42)
►
December
(4)
►
November
(6)
►
October
(16)
▼
September
(13)
Solar heating pipes installed
And still more rain......
Here comes the rain....
We have a house!
We have water again.
The framing all ready to go
We have a floor!
All ready for the concrete
More plumbing
Polystyrene and plumbing installed
Boxing set up
Sand and Power
Pile Driving
►
August
(2)
►
January
(1)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.