Wednesday, September 16, 2009

All ready for the concrete

Finally all the steel has been placed and tied together. My under floor heating pipes are still holding pressure so no serious damage has been done to the pipes.

The building inspector did his inspection this afternoon. Luckily he was more than happy that everything was as it should be so pouring the concrete can proceed as planned.

The concrete pump and concrete trucks start arriving at 7.30 tomorrow morning. I'll hang around for a while to take some photos and be on hand if they damage the heating pipes.

The builder is all ready to start next week.