The final plaster coat has been added to 3/4 of the house today. We have chosen an Adobe finish to try and achieve a slightly rustic look. There are three coats of acrylic paint yet to go over the plaster.
All of the Internal doors have now been fitted. The doors into the lounge are 2.4m high. We have chosen higher doors so that the hot air in summer will flow from the lounge and up through the skylight in the centre of the house without any obstructions. The doors to the left of the lounge are for storage cupboard and a utility cupboard where all the underfloor heating and solar panel controls will be situated.